From the first site outward, instrumented

We develop our own facilities and projects integrated into our partners' value chains. In both models, we turn residual biomass into biochar and generate verified carbon removals. We are starting in Portugal and preparing to expand to Mozambique and Angola.

Offsetting

We develop our own biochar production facilities. We measure and document the CO₂ removals, which are verified by independent bodies before the certification programme issues the credits. Companies can buy these credits to support climate action beyond their own value chain.

Portugal

Facility 1 · Miranda do Corvo · 50,000 t/yr of feedstock

● In development

Portugal

Facility 2 · 50,000 t/yr of feedstock

● Pipeline

Mozambique

6–8 units

● Pipeline

Angola

6–8 units

● Pipeline

Development roadmap · PT → MZ → AO

Insetting

Units sited inside a partner's operation, converting their own residue. The removal lands in their value chain: their scope 3, not an open-market credit.

Partner value chains

3–4 units

● Pipeline
Isometric illustration of a farm: a barley field, a barn, and a tractor spreading biochar in a dark band across the soil.

Statuses reflect development stage. No operating production facilities yet. Feedstock throughput is biomass processed, not CO₂ removed. First production follows in 2027.

Facility 1 · Miranda do Corvo · In development

First facility: from biomass to verified removal

The first facility is being developed in Miranda do Corvo, in the Coimbra district, collecting fire-risk forestry and agricultural residue from a 50–100 km radius: the biomass that fuels the fire season becomes the feedstock for the reactor. The protocol with the municipality covers siting and permitting; it is not a feedstock supply agreement. Commissioning targets mid 2027, with first commercial production the same year. Every removal is verified by an independent body before any credit is issued.

50,000

t/yr feedstock · design

50–100 km

collection radius

18–26k

tCO₂e/yr · design estimate

2027

first production

Design figures, not measured ones; the measured numbers replace these at commissioning. Feedstock throughput is biomass processed, not CO₂ removed.

Feedstock basin · 50–100 km

Schematic · approximate positions

50 km100 kmAtlanticSpain
  • Facility 1 · Miranda do Corvo: First site, in development in Miranda do Corvo. First production targeted for 2027.
  • Collection rings · 50–100 km: Collection typically reaches 50 to 100 km around the first site.
  • Miranda do Corvo: Municipal partner: a siting and permitting protocol with the Câmara Municipal. It is not a feedstock supply agreement.
  • Sabugal: Municipal partner: a site and permitting protocol with the Câmara Municipal.
  • CBE (Centro da Biomassa para a Energia): Technical partner for feedstock characterisation. Not placed on the map.

Selected work

In development, instrumented from day one

Isometric site plan of the facility: production hall, pyrolysis unit, feedstock bays, weighbridge at the gate and a yard of biochar big bags.Facility · site plan

Portugal · Flagship

First industrial facility

Facility 1, in Miranda do Corvo, is designed for 50,000 t/yr of feedstock, instrumented from day one, with every batch analysed by an accredited laboratory. Facility 2 is the next step in Portugal.

Isometric illustration of a containerized pyrolysis unit standing beside a partner mill, with residue moving between them on a conveyor.Modular unit · at a partner mill

Insetting

Units inside partner value chains

Three to four units sited at partner operations, converting their own residue. The removal lands in their footprint rather than on the open market. In discussion with partners now.

Isometric illustration of an open-top feedstock container filled with woodchips, with a conveyor lifting them out.Feedstock · container

Feedstock

Fire-risk biomass programme

Supply agreements in negotiation with forest-management operators around the first site, removal that also prevents the next fire season.

Build journal

Facility 1, as it happens

A pre-launch company asks you to believe a schedule. The least we can do is let you watch it: what moved, when, and what it unblocks. Updated as the build proceeds, including the months when little happens.

July 2026

Counting method published in full

Every gate, measurement and reconciliation rule behind a Recarbono tonne is now public, before a single tonne exists to be flattered by them. The standard can be audited today and held to as the first site comes online.

July 2026

Protocol signed with Miranda do Corvo

A site and permitting protocol with the Câmara Municipal of the municipality around our first site. It covers siting and permitting cooperation; it is not a feedstock supply agreement, and we will not describe it as one.

June 2026

Partnership with CBE

The Centro da Biomassa para a Energia joins the build: the national reference for biomass in Portugal, and the technical partner for feedstock characterisation.

Next

Commissioning: first material through the reactor, target mid 2027.