recarbono

For carbon-credit buyers

Durable removals you can actually verify

Lab-grade, CRCF-aligned permanent carbon removal: measured at the plant, conservatively counted, traceable to retirement. First deliveries follow our 2027 production start; early offtake secures them.

Diligence starts here: where we stand, who is building this and the sites behind the tonnes.

Vetting

Every tonne meets the bar

The criteria high-integrity buyers hold suppliers to, and how we meet them.

Durability

Permanence engineered for several centuries (the CORC200+ class) and measured, batch by batch, by R₀ petrography. We claim what the lab result supports, never more.

Additionality

Removal that would not happen without the credit revenue.

Verifiability

Accredited lab → CRCF-native dMRV → serialised registry record.

Net negativity

Full lifecycle accounting of the production process.

No double-counting

One serialised certificate per tonne, retired transparently.

Safety & regulatory

EU-jurisdiction, CRCF-aligned, real counsel on green claims.

The evidence trail

This is what a tonne looks like before you buy it

A demonstration batch, reconciled the way every real one will be: sensor against laboratory, uncertainty deducted, the conservative figure carried forward.

See the full chain

Batch RC-DEMO-0001 · how a tonne is counted

In development

Gross sequestration

2.90

Pyrolysis & process

-0.18

Feedstock transport

-0.12

Permanence factor

-0.52

Uncertainty discount

-0.09

Net removal

1.99

Sensor vs laboratory · gross tCO₂e/t, before deductions

sensor2.98
lab2.90

The two chains disagree. In this illustration the laboratory's 2.90 enters the waterfall above as gross, and the sensor reading is logged for reconciliation. The certification methodology sets the rule; uncertainty is deducted, never averaged.

Illustrative batch · tCO₂e per tonne of biochar. Not operational data.

Quality

Independently anchored

Measured

not estimated

Permanence will be quantified per batch by accredited laboratories, from the carbon structure itself, not inferred from process settings.

Conservative

by rule

We apply the conservative rules of the certification methodology we adopt, based on accredited laboratory analysis. Uncertainty is deducted, never averaged.

1:1

serialised

One certificate per tonne, retired on a public registry, traceable back to the batch that produced it.

Standards we build to, not certifications we hold

Certification path

Targeting Puro.earth (CORC200+) and Isometric for credits, and EBC-Agro for product, with the World Biochar Certificate (WBC) for our African sites, and the whole evidence chain mapped to the EU's CRCF (Delegated Regulation (EU) 2026/285).

Credit products

Two registries, one standard of proof

Puro.earth · primary route

CORC200+

The CO₂ Removal Certificate from the largest engineered-removal registry, in the several-centuries durability class. Broad market recognition and liquidity, familiar to corporate buyers and rating agencies alike, and the registry that has applied for recognition as an EU CRCF certification scheme.

Widely recognised · exchange-listed · rating-covered

Isometric · alternate route

Isometric credit

A science-led registry with the strictest published verification in the market, and its own biochar protocol. The route for buyers whose diligence bar is set by the science rather than by market liquidity.

Science-led · strict verification · public protocol

Puro.earth is our primary route; Isometric is available where a buyer's diligence calls for it. Both draw on the same laboratory-measured, dMRV-verified data, and a tonne is issued once: on one registry, never both. Definitions in the glossary.

How to contract

Secure future volume now

Durable supply is scarce: biochar is roughly 90% of the durable removals actually delivered and buyer numbers keep climbing, while delivery still trails what is contracted. Both structures fix your terms today, ahead of the 2027 production start, priced per contract, volume and registry.

Isometric scene: a big bag of biochar on a weighing plinth, its data streaming into a ledger panel beside a safe.

Forward offtake

Commit now, pay on delivery

With a forward offtake, we agree the volume, price and schedule in advance, with payment tied to delivery of the issued credits.

Volume, price and schedule agreed · payment on delivery

Prepurchase

Pay a portion now, back the facility

With a prepurchase, the buyer pays part of the price in advance to support the development of the facility, on terms agreed in the contract.

Partial advance payment · contractual terms

Spot sales follow once issued credits exist. Price is set by contract, according to volume, delivery date and purchase structure.

Build your offtake

Shape your removal package

Set out what you need and we will price it: volume, delivery window and registry route.

For scale: Facility 1 is designed for an estimated 18,000–26,000 tCO₂e a year at full operation. That is a design estimate, replaced by measured data as the site runs.

Volume5,000 t
Timeline3 yr

Registry

Your enquiry

5,000 t

Delivery window3 yr
Approx. per year1,667 t
Registry routeCORC
PricingPer contract
Request pricing

Pricing is agreed per contract; it depends on volume, delivery window and registry route. We publish no indicative price we would not honour.

Not a quote or an offer. Pricing is agreed per contract, project and registry.

Offtake contracts

Offtakes with clear criteria

We are structuring our future offtake contracts with the support of a leading international consultancy. Each contract will set out volumes, price, delivery schedule, independent verification of the removals, and mechanisms to manage any delays or differences from the expected volume.

FAQ

The questions buyers ask

Including the ones we would rather answer than have you discover later.

Next step

Ready to secure 2027 volume?

Set your volume, window and registry above. The figures carry into the form, so the first reply already speaks to your package rather than asking you to repeat it.

What early offtake buys

  • Priority on first-site volume, with delivery scheduled in the contract.
  • The evidence trail as it accumulates, not a certificate at the end.
  • A price agreed today, in a market where durable supply is tightening.